SHALIMAR ZERO DAMP is a fibre reinforced elastomeric waterproof coating for all interior and exterior applications. The paint coating forms a sturdy waterproofing shield along with crack bridging technology that not only protects the house from thermal violations but also increases the life of roofs and walls.

PRODUCT BENEFITS

  • s-icon

    Very good resistance against weathering, ageing and UV rays.

  • s-icon

    Single pack and easy to apply.

  • s-icon

    Good Water Resistant.

  • s-icon

    Elastomeric & Fiber reinforced – Excellent Crack-Bridging property under expansive /contractive movement in structure.

  • s-icon

    Environmentally friendly (solvent free).

  • s-icon

    Excellent Adhesion to the substrate.

  • s-icon

    Good Algae / Fungal Resistance.

  • s-icon

    As a top coat have the ability the Surface temperature reduction up to 5°C.

  • s-icon

    Preventive protection for new as well as existing reinforced concrete structures exposed to aggressive environment.

  • s-icon

    High resistance against CO2 diffusion reducing the rate of carbonation.

Available
Pack Sizes
  • 1ltr
  • 4ltr
  • 10ltr
  • 20ltr
Shelf Life
3 YearsFROM THE DATE MANUFACTURING
Finish
  • Smooth
Coverage
9-15  SQ.FT/LITRE COAT 
Low Voc
30-40GRAMS/LITRE

PRE PAINTING STEPS

  • s-icon

    PLASTER : New masonry surfaces must be allowed to cure completely. It is recommended to allow 28 days as the curing time for new masonry surfaces. The roof must have positive slope/ drainage system to avoid water ponding at places.

  • s-icon

    CLEANING : Surface should be free from any loose paint, dust or grease. Remove all existing bitumen coatings completely. It is recommended to use intense wire brushing, high speed water jet and vacuum cleaner for thorough cleaning of the surface to avoid “Peeling off” problems.

  • s-icon

    REPAIRING : The substrate must be checked for its soundness using small hammer. All cracks at corner joints, channels and parapets should be properly treated.

  • s-icon

    FILLING FOR CRACKS : For filling cracks use recommended Crack Sealer. Bigger cracks, damaged portions and hollow areas must be repaired.

POST PAINTING CARE

For the best performance of the paint, ensure proper washing and cleaning of all algal and fungal growth, if any, at regular intervals of six months.

APPLICATION PROCESS

HORIZONTAL SURFACE:

  • s-icon

    Apply a fresh coat of Zero Damp with brush with suggested dilution of 30-35% by volume

  • s-icon

    Allow it to dry for 4-6 hours and then apply another coat of Zero Damp with Brush/Roller without dilution.

  • s-icon

    Allow it to dry for 4-6 hours and then apply second coat of Zero Damp with Brush and Roller without dilution

VERTICAL SURFACE:

  • s-icon

    Apply a fresh coat of Zero Damp with brush with suggested dilution of 30-35% by volume as Self Priming

  • s-icon

    Allow it to dry for 4-6 hours and then apply another coat of Zero Damp with Brush/Roller without dilution.

  • s-icon

    In case of top coat application go by the standard application procedure for top coat.